Tires, Care Repair & Maintenance - Firestone Complete Auto Care

  • Tires
    • Select Your Tire
    • Browse Tire Catalog
    • Tire Resource
    • Blizzak
    • Ecopia
    • Run Flat
    • Tire Technology
    • Tire Pressure
    • Learn About Tires
    • Frequently Asked Questions
    • Tire Warranty Options
    • Motorsports
    • Car Care Video Tutorials
    • How to Check Your Tread Depth
  • Car & Auto Maintenance
    • Maintaining Your Auto
      • Oil Change
      • Maintenance Tune-Up
      • Transmission Service
      • A/C Service
      • Radiator Service
      • Vehicle Inspection
    • View Scheduled Maintenance
    • Sign-up for Maintenance Reminders
    • Car Care Video Tutorials
    • Service Warranty Options
  • Car & Auto Repairs
    • Repair Services
      • Brake Repair
      • Alignment
      • Engine Repair
      • Battery
    • Car Care Video Tutorials
    • Service Warranty Options
  • Offers
  • Firestone Rewards
  • Roadside Assistance
  • Facebook
  • Twitter
  • YouTube
  • Share. Learn. Save.
 

New Store Location Criteria

Demographics

  • 30,000–50,000 minimum population within 3 mile radius
  • 2–4% annual population growth
  • $50,000 median household income
  • Minimum traffic counts should yield 25,000–30,000 V.P.D.

Deal Structure

  • Purchase/Self Development
  • Vacant Auto Care Centers
  • Built-to-Suit/15 year lease with five (5) year options
  • Operating Auto Centers/Takeover

Standard Site Criteria

  • Lot size 50,000–60,000 square feet with 150–200 feet of frontage
  • Shopping center pad of 7,500–8,100 square feet with narrowest frontage of not less than 55 feet
  • Typical store size 7,500–8,100 square feet including sales, service and storage space

Utility Service Minimums

  • City Water — 1" water line from existing main line at approximately 60 psi. Connected ¾" meter or 1" meter. Typical usage: 550–600 gallons per day. 6" water line from existing main line for fire suppression system.
  • Electric ** — 400 amps. Service feed at 120v/208v/3 phase 4-wire. Acceptable alternative: 120v/240v/3 phase 4 wire. Connected load: 65–90 KW.
  • Natural Gas ** — Service line from the existing main to provide 400–1,000 cubic feet per hour of natural gas.
  • Sewer — Existing sewer to accept 4" gravity — flow effluent line delivering 500–550 gallons per day to the sewer.
  • Telephone — 2" conduit minimum

**The size of the proposed store and the anticipated heating loads based on regional conditions will determine the utility requirements within listed ranges.

New Store Style A Download (pdf)

New Store Style B Download (pdf)


 

Firestone Complete Auto Care

  • Find A Store
  • Careers
  • Contact Us
  • About Us
  • Special Offers
  • Firestone Rewards
  • Environment
  • Real Estate
  • Firestone Fleet Care
  • Roadside Assistance

Auto Service

  • Tires
  • A/C Service
  • Alignment
  • Battery
  • Brake Service
  • Engine Repair
  • Oil Change
  • Radiator Service
  • Transmission Service
  • Tune-Up
  • Vehicle Inspection

For Your Car

  • Get a Tire Quote
  • Get a Battery Quote
  • Schedule an Appointment
  • Recommended Maintenance
  • Predict Battery Life
  • Look Up Tire Pressure
  • Watch Car Care Videos
  • Gasonomics 101

E-mail Sign Up

Firestone Complete Auto Care respects your privacy. We don’t rent or sell your personal information to anyone. Ever. Read Our Privacy Statement

Firestone Credit Card

Need help with unexpected expenses? Convenient credit. Quick online application.
Learn More

© 2012 Firestone Complete Auto Care. All Rights Reserved. | Site Map | Privacy Statement | Legal Notice | Mobile Web Site